Wednesday, April 28, 2010

Framing Almost Done

The dormers and roof line have been completed at this point. They should be done framing by Friday the April 30th. Now it is starting to look like something. The first picture is of the front view and the second is from the side.



Sunday, April 25, 2010

Floor Plan

Colleen thought it would be a good idea to post the floor plan and look of the house. Just click on the picture for a larger image.

























Second Story Framed

It looks like the framers work on Sunday. They have almost completed framing the second story. The first picture shows the front of the house. The second shows the master bedroom from what will be the master bath. The next two pictures show the 2nd and 3rd bedrooms along with the laundry and closets. The final picture shows the media room.

























Saturday, April 24, 2010

Stairs and Crawl Space

These framing guys are fast. They completed the first floor and are ready to frame the second floor in only two days! We were also very excited to see the stairs. We have included some pictures of the crawl space. It is nice because we wont have to be bent over while accessing the furnace.
















Friday, April 23, 2010

Framing: First Story

The Framing was started on April 23rd. The pictures below show what was completed in one day. The first picture is the Outside front of the first story. The second, third, fourth, and fifth pictures show the dinning room, kitchen, breakfast area (vertical picture), and living room.










Footer/Foundation

In early April the footers were poured and two weeks later the foundation was completed.


Our New Lot

Here are some pictures of our new lot. The lot is a 1/4 of an acre measuring 75' wide by 95' deep. We liked that nothing new would be built in front behind or on the left side of the house.