Wednesday, April 28, 2010
Framing Almost Done
The dormers and roof line have been completed at this point. They should be done framing by Friday the April 30th. Now it is starting to look like something. The first picture is of the front view and the second is from the side.


Sunday, April 25, 2010
Floor Plan
Second Story Framed
It looks like the framers work on Sunday. They have almost completed framing the second story. The first picture shows the front of the house. The second shows the master bedroom from what will be the master bath. The next two pictures show the 2nd and 3rd bedrooms along with the laundry and closets. The final picture shows the media room.

Saturday, April 24, 2010
Stairs and Crawl Space
These framing guys are fast. They completed the first floor and are ready to frame the second floor in only two days! We were also very excited to see the stairs. We have included some pictures of the crawl space. It is nice because we wont have to be bent over while accessing the furnace.
Friday, April 23, 2010
Framing: First Story
The Framing was started on April 23rd. The pictures below show what was completed in one day. The first picture is the Outside front of the first story. The second, third, fourth, and fifth pictures show the dinning room, kitchen, breakfast area (vertical picture), and living room.
Our New Lot
Here are some pictures of our new lot. The lot is a 1/4 of an acre measuring 75' wide by 95' deep. We liked that nothing new would be built in front behind or on the left side of the house.
Subscribe to: