Wednesday, June 16, 2010

Garage, Paint, Trim

Here are a few more pictures. The outside is almost finished with just a few more details left. The ceilings have been textured with each room getting a different design around the lights and fans. The paint and trim are also almost complete. The hardwoods are in the house and the tile will be laid this week.



















Sunday, May 16, 2010

Siding and Drywall Complete

The siding has been completed along with the drywall. The supplies are at the house for tape and mud which should be done this week. Below are pictures of the front along with the foyer, master bedroom, master bath vault, and media room.














Monday, May 10, 2010

Shaker Siding

The Shaker Siding has been started and the Shutters have been installed where the siding has been completed. Looks like the siding should be done this week.

Sunday, May 9, 2010

Siding has been started.

The siding is about half done. The front, left, and rear porch still need siding. Also the dormers will have a dark shad shaker siding.










Tuesday, May 4, 2010

Shingles are done...

The shingles were installed in one day on Monday the 3rd. The siding has arrived also, and should go on sometime this week.

Saturday, May 1, 2010

Framing Finished

The framing is finished and the plumbing has been started. The pictures give a very good idea of what the house will look like. The roof will be on by Monday or Tuesday and the siding will be started shortly after.









Wednesday, April 28, 2010

Framing Almost Done

The dormers and roof line have been completed at this point. They should be done framing by Friday the April 30th. Now it is starting to look like something. The first picture is of the front view and the second is from the side.